• Facebook
  • Twitter
x

MARK KERRISON | Photojournalist

  • Live News Feed
  • Slideshows
  • About
    • About
    • Data Protection
    • Terms and Conditions
  • Contact
Show Navigation
Cart Lightbox Client Area

Search Results

Refine Search
Match all words
Match any word
Prints
Personal Use
Royalty-Free
Rights-Managed
(leave unchecked to
search all images)
Next
{ 2091 images found }
twitterlinkedinfacebook

Loading ()...

  • Luton, UK. 27th June, 2015. A sign reading 'Welcome to Luton' outside the local railway station.
    2015-Luton-Britain-First-UAF-009.jpg
  • Denham, UK. 11th September, 2020. A site where tree felling is currently taking place for the HS2 high-speed rail link. Many thousands of trees have already been felled for the HS2 project in the Colne Valley and tree felling is currently taking place in Denham Green, Denham and Harefield.
    HS2-Denham-Green-camp-works-011.jpg
  • Kenilworth, UK. 24th August, 2020. Land from which many trees have been cleared by HS2 is viewed from Crackley Woods. Anti-HS2 activists continue to protest against and attempt to prevent or delay works in connection with the controversial HS2 high-speed rail link from a series of camps along the Phase One route from Euston to north of Birmingham.
    MK-20200824-HS2-Crackley-Woods-prote...jpg
  • A temporary haul road is prepared for HGVs to use in the construction of a ventilation shaft for the Chiltern Tunnel on the HS2 high-speed rail link on 18th July 2020 in Chalfont St Giles, United Kingdom. The Department for Transport approved the issuing of Notices to Proceed by HS2 Ltd to the four Main Works Civils Contractors (MWCC) working on the £106bn rail project in April 2020.
    HS2-works-Chalfont-St-Giles-015.jpg
  • A temporary haul road is prepared for HGVs to use in the construction of a ventilation shaft for the Chiltern Tunnel on the HS2 high-speed rail link on 18th July 2020 in Chalfont St Giles, United Kingdom. The Department for Transport approved the issuing of Notices to Proceed by HS2 Ltd to the four Main Works Civils Contractors (MWCC) working on the £106bn rail project in April 2020.
    HS2-works-Chalfont-St-Giles-009.jpg
  • A temporary haul road is prepared for HGVs to use in the construction of a ventilation shaft for the Chiltern Tunnel on the HS2 high-speed rail link on 18th July 2020 in Chalfont St Giles, United Kingdom. The Department for Transport approved the issuing of Notices to Proceed by HS2 Ltd to the four Main Works Civils Contractors (MWCC) working on the £106bn rail project in April 2020.
    HS2-works-Chalfont-St-Giles-006.jpg
  • A new Affinity Water pipeline is constructed between Chalfont St Giles and Amersham in conjunction with the HS2 high-speed rail link on 18th July 2020 in Chalfont St Giles, United Kingdom. The pipeline is being constructed to protect against the creation of turbidity, or cloudy water, in the water supply due to tunnelling and piledriving activities on the HS2 project.
    HS2-works-Chalfont-St-Giles-003.jpg
  • London, UK. 26th June 2018. Works continue in Euston Square Gardens involving the planned felling by HS2 Ltd of mature London Plane, Red Oak, Common Lime, Common Whitebeam and Wild Service trees to make way for temporary sites for construction vehicles and a displaced taxi rank as part of preparations for the HS2 high-speed rail line.
    HS2-Euston-Square-art-protest_006.jpg
  • Denham Green, UK. 11th September, 2020. A site where tree felling is currently taking place for the HS2 high-speed rail link. Many thousands of trees have already been felled for the HS2 project in the Colne Valley and tree felling is currently taking place in Denham Green, Denham and Harefield.
    HS2-Denham-Green-camp-works-014.jpg
  • Denham Green, UK. 11th September, 2020. Mature trees marked with orange paint at a site where tree felling is currently taking place for the HS2 high-speed rail link. Many thousands of trees have already been felled for the HS2 project in the Colne Valley and tree felling is currently taking place in Denham Green, Denham and Harefield.
    HS2-Denham-Green-camp-works-020.jpg
  • Denham, UK. 11th September, 2020. A tree house installed by tree protectors from HS2 Rebellion in a mature oak tree expected to be felled as part of works connected to the HS2 high-speed rail link. Anti-HS2 activists continue to try to prevent or delay works on the controversial £106bn HS2 high-speed rail link from a series of such protection camps based along the route of the line between London and Birmingham.
    HS2-Denham-Green-camp-works-013.jpg
  • Denham, UK. 11th September, 2020. A banner reading ‘Your Trees Your Kids Future’ placed by environmental activists from HS2 Rebellion at Denham Protection Camp. Anti-HS2 activists continue to try to prevent or delay works on the controversial £106bn HS2 high-speed rail link from a series of such protection camps based along the route of the line between London and Birmingham.
    HS2-Denham-Green-camp-works-010.jpg
  • Denham, UK. 11th September, 2020. A Buckinghamshire Council Planning Site Notice for HS2 works at Denham Ford posted on a carved tree in Denham Country Park. Works scheduled for the immediate vicinity include the construction of a temporary bridge across the river Colne to be used in conjunction with the rerouting of pylons through beautiful woodland in Denham Country Park.
    HS2-Denham-Green-camp-works-005.jpg
  • A site where tree felling is currently taking place for the HS2 high-speed rail link is pictured on 11 September 2020 in Denham Green, United Kingdom. Many thousands of trees have already been felled for the HS2 project in the Colne Valley and tree felling is currently taking place in Denham Green, Denham and Harefield.
    HS2-Denham-Green-camp-works-003.jpg
  • Graffiti reading ‘Smash HS2’ sprayed on boards around a construction site for the HS2 high-speed rail link in the Colne Valley is pictured on 11 September 2020 in Denham Green, United Kingdom. Anti-HS2 activists continue to try to prevent or delay works on the controversial £106bn HS2 high-speed rail link from a series of protection camps based along the route of the line between London and Birmingham.
    HS2-Denham-Green-camp-works-012.jpg
  • Graffiti reading ‘HS2 Is Making People Homeless’ sprayed on boards around a construction site for the HS2 high-speed rail link in the Colne Valley is pictured on 11 September 2020 in Denham Green, United Kingdom. Anti-HS2 activists continue to try to prevent or delay works on the controversial £106bn HS2 high-speed rail link from a series of protection camps based along the route of the line between London and Birmingham.
    HS2-Denham-Green-camp-works-018.jpg
  • Graffiti reading ‘HS2 Is State Violence’ sprayed on boards around a construction site for the HS2 high-speed rail link in the Colne Valley is pictured on 11 September 2020 in Denham Green, United Kingdom. Anti-HS2 activists continue to try to prevent or delay works on the controversial £106bn HS2 high-speed rail link from a series of protection camps based along the route of the line between London and Birmingham.
    HS2-Denham-Green-camp-works-002.jpg
  • Preparatory works for the HS2 high-speed rail link at the South Portal site are pictured on 14 September 2020 in West Hyde, United Kingdom. A 17m headwall for the 10-mile Chiltern Tunnel was recently completed at the site as a prelude to three years of drilling through the Chilterns using two German-made 2,000 tonne tunnel boring machines (TBMs).
    HS2-South-Portal-gates-block-056.jpg
  • Kenilworth, UK. 24th August, 2020. Crackley Woods Protection Camp. Anti-HS2 activists continue to protest against and attempt to prevent or delay works in connection with the controversial HS2 high-speed rail link from a series of camps along the Phase One route from Euston to north of Birmingham.
    MK-20200824-HS2-Crackley-Woods-prote...jpg
  • Chalfont St Giles, UK. 18th July, 2020. A temporary haul road and compound are prepared for use in the construction of a ventilation shaft for the Chiltern Tunnel on the HS2 high-speed rail link. The Department for Transport approved the issuing of Notices to Proceed by HS2 Ltd to the four Main Works Civils Contractors (MWCC) working on the £106bn rail project in April 2020.
    HS2-works-Chalfont-St-Giles-033.jpg
  • Chalfont St Giles, UK. 18th July, 2020. A temporary haul road is prepared for use in the construction of a ventilation shaft for the Chiltern Tunnel on the HS2 high-speed rail link. The Department for Transport approved the issuing of Notices to Proceed by HS2 Ltd to the four Main Works Civils Contractors (MWCC) working on the £106bn rail project in April 2020.
    HS2-works-Chalfont-St-Giles-031.jpg
  • Chalfont St Giles, UK. 18th July, 2020. Earth is piled up close to the site of a ventilation shaft for the Chiltern Tunnel on the HS2 high-speed rail link. The Department for Transport approved the issuing of Notices to Proceed by HS2 Ltd to the four Main Works Civils Contractors (MWCC) working on the £106bn rail project in April 2020.
    HS2-works-Chalfont-St-Giles-030.jpg
  • Chalfont St Giles, UK. 18th July, 2020. A temporary haul road is prepared for use in the construction of a ventilation shaft for the Chiltern Tunnel on the HS2 high-speed rail link. The Department for Transport approved the issuing of Notices to Proceed by HS2 Ltd to the four Main Works Civils Contractors (MWCC) working on the £106bn rail project in April 2020.
    HS2-works-Chalfont-St-Giles-029.jpg
  • Chalfont St Giles, UK. 18th July, 2020. A temporary haul road is prepared for use in the construction of a ventilation shaft for the Chiltern Tunnel on the HS2 high-speed rail link. The Department for Transport approved the issuing of Notices to Proceed by HS2 Ltd to the four Main Works Civils Contractors (MWCC) working on the £106bn rail project in April 2020.
    HS2-works-Chalfont-St-Giles-028.jpg
  • Chalfont St Giles, UK. 18th July, 2020. A temporary haul road is prepared for use in the construction of a ventilation shaft for the Chiltern Tunnel on the HS2 high-speed rail link. The Department for Transport approved the issuing of Notices to Proceed by HS2 Ltd to the four Main Works Civils Contractors (MWCC) working on the £106bn rail project in April 2020.
    HS2-works-Chalfont-St-Giles-026.jpg
  • Chalfont St Giles, UK. 18th July, 2020. A new Affinity Water pipeline is constructed between Chalfont St Giles and Amersham in conjunction with the HS2 high-speed rail link. The pipeline is being constructed to protect against the creation of turbidity, or cloudy water, in the water supply due to tunnelling and piledriving activities on the HS2 project.
    HS2-works-Chalfont-St-Giles-025.jpg
  • Chalfont St Giles, UK. 18th July, 2020. A new Affinity Water pipeline is constructed between Chalfont St Giles and Amersham in conjunction with the HS2 high-speed rail link. The pipeline is being constructed to protect against the creation of turbidity, or cloudy water, in the water supply due to tunnelling and piledriving activities on the HS2 project.
    HS2-works-Chalfont-St-Giles-024.jpg
  • Chalfont St Giles, UK. 18th July, 2020. A new water pipeline and temporary haul road are constructed for the HS2 high-speed rail link close to the Chiltern Heritage Trail and South Bucks Way. The pipeline is being constructed to protect against the creation of turbidity in the water supply as a result of tunnelling and piledriving whilst the haul road will be used to construct a ventilation shaft for the Chiltern Tunnel.
    HS2-works-Chalfont-St-Giles-022.jpg
  • Chalfont St Giles, UK. 18th July, 2020. A new Affinity Water pipeline is constructed between Chalfont St Giles and Amersham in conjunction with the HS2 high-speed rail link. The pipeline is being constructed to protect against the creation of turbidity, or cloudy water, in the water supply due to tunnelling and piledriving activities on the HS2 project.
    HS2-works-Chalfont-St-Giles-021.jpg
  • Chalfont St Giles, UK. 18th July, 2020. A new Affinity Water pipeline is constructed between Chalfont St Giles and Amersham in conjunction with the HS2 high-speed rail link. The pipeline is being constructed to protect against the creation of turbidity, or cloudy water, in the water supply due to tunnelling and piledriving activities on the HS2 project.
    HS2-works-Chalfont-St-Giles-019.jpg
  • Chalfont St Giles, UK. 18th July, 2020. A temporary haul road is prepared for use in the construction of a ventilation shaft for the Chiltern Tunnel on the HS2 high-speed rail link. The Department for Transport approved the issuing of Notices to Proceed by HS2 Ltd to the four Main Works Civils Contractors (MWCC) working on the £106bn rail project in April 2020.
    HS2-works-Chalfont-St-Giles-018.jpg
  • A High Court injunction notice is displayed on fencing at the site of a ventilation shaft for the Chiltern Tunnel on the HS2 high-speed rail link on 18th July 2020 in Chalfont St Giles, United Kingdom. The Department for Transport approved the issuing of Notices to Proceed by HS2 Ltd to the four Main Works Civils Contractors (MWCC) working on the £106bn rail project in April 2020.
    HS2-works-Chalfont-St-Giles-016.jpg
  • A temporary haul road is prepared for HGVs to use in the construction of a ventilation shaft for the Chiltern Tunnel on the HS2 high-speed rail link on 18th July 2020 in Chalfont St Giles, United Kingdom. The Department for Transport approved the issuing of Notices to Proceed by HS2 Ltd to the four Main Works Civils Contractors (MWCC) working on the £106bn rail project in April 2020.
    HS2-works-Chalfont-St-Giles-014.jpg
  • Earth is piled up at the site of a ventilation shaft for the Chiltern Tunnel on the HS2 high-speed rail link on 18th July 2020 in Chalfont St Giles, United Kingdom. The Department for Transport approved the issuing of Notices to Proceed by HS2 Ltd to the four Main Works Civils Contractors (MWCC) working on the £106bn rail project in April 2020.
    HS2-works-Chalfont-St-Giles-013.jpg
  • Earth is piled up at the site of a ventilation shaft for the Chiltern Tunnel on the HS2 high-speed rail link on 18th July 2020 in Chalfont St Giles, United Kingdom. The Department for Transport approved the issuing of Notices to Proceed by HS2 Ltd to the four Main Works Civils Contractors (MWCC) working on the £106bn rail project in April 2020.
    HS2-works-Chalfont-St-Giles-010.jpg
  • A temporary haul road is prepared for HGVs to use in the construction of a ventilation shaft for the Chiltern Tunnel on the HS2 high-speed rail link on 18th July 2020 in Chalfont St Giles, United Kingdom. The Department for Transport approved the issuing of Notices to Proceed by HS2 Ltd to the four Main Works Civils Contractors (MWCC) working on the £106bn rail project in April 2020.
    HS2-works-Chalfont-St-Giles-005.jpg
  • Heavy equipment in a compound alongside a new Affinity Water pipeline and temporary haul road which are being constructed in conjunction with the HS2 high-speed rail link on 18th July 2020 in Chalfont St Giles, United Kingdom. The Department for Transport approved the issuing of Notices to Proceed by HS2 Ltd to the four Main Works Civils Contractors (MWCC) working on the £106bn rail project in April 2020.
    HS2-works-Chalfont-St-Giles-002.jpg
  • A temporary haul road is prepared for HGVs to use in the construction of a ventilation shaft for the Chiltern Tunnel on the HS2 high-speed rail link on 18th July 2020 in Chalfont St Giles, United Kingdom. The Department for Transport approved the issuing of Notices to Proceed by HS2 Ltd to the four Main Works Civils Contractors (MWCC) working on the £106bn rail project in April 2020.
    HS2-works-Chalfont-St-Giles-001.jpg
  • London, UK. 26th June 2018. Works continue in Euston Square Gardens involving the planned felling by HS2 Ltd of mature London Plane, Red Oak, Common Lime, Common Whitebeam and Wild Service trees to make way for temporary sites for construction vehicles and a displaced taxi rank as part of preparations for the HS2 high-speed rail line.
    HS2-Euston-Square-art-protest_008.jpg
  • Denham, UK. 11th September, 2020. A site where tree felling is currently taking place for the HS2 high-speed rail link. Many thousands of trees have already been felled for the HS2 project in the Colne Valley and tree felling is currently taking place in Denham Green, Denham and Harefield.
    HS2-Denham-Green-camp-works-017.jpg
  • Denham, UK. 11th September, 2020. Mature trees marked with orange paint at a site where tree felling is currently taking place for the HS2 high-speed rail link. Many thousands of trees have already been felled for the HS2 project in the Colne Valley and tree felling is currently taking place in Denham Green, Denham and Harefield.
    HS2-Denham-Green-camp-works-007.jpg
  • Denham, UK. 11th September, 2020. A tree house installed by tree protectors from HS2 Rebellion in a mature oak tree expected to be felled as part of works connected to the HS2 high-speed rail link. Anti-HS2 activists continue to try to prevent or delay works on the controversial £106bn HS2 high-speed rail link from a series of such protection camps based along the route of the line between London and Birmingham.
    HS2-Denham-Green-camp-works-009.jpg
  • Denham, UK. 11th September, 2020. Two signs placed by environmental activists from HS2 Rebellion at Denham Protection Camp. Anti-HS2 activists continue to try to prevent or delay works on the controversial £106bn HS2 high-speed rail link from a series of such protection camps based along the route of the line between London and Birmingham.
    HS2-Denham-Green-camp-works-015.jpg
  • Preparatory works for the HS2 high-speed rail link at the South Portal site are pictured on 14 September 2020 in West Hyde, United Kingdom. A 17m headwall for the 10-mile Chiltern Tunnel was recently completed at the site as a prelude to three years of drilling through the Chilterns using two German-made 2,000 tonne tunnel boring machines (TBMs).
    HS2-South-Portal-gates-block-044.jpg
  • Kenilworth, UK. 24th August, 2020. Crackley Woods Protection Camp. Anti-HS2 activists continue to protest against and attempt to prevent or delay works in connection with the controversial HS2 high-speed rail link from a series of camps along the Phase One route from Euston to north of Birmingham.
    MK-20200824-HS2-Crackley-Woods-prote...jpg
  • Chalfont St Giles, UK. 18th July, 2020. A temporary haul road is prepared for use in the construction of a ventilation shaft for the Chiltern Tunnel on the HS2 high-speed rail link. The Department for Transport approved the issuing of Notices to Proceed by HS2 Ltd to the four Main Works Civils Contractors (MWCC) working on the £106bn rail project in April 2020.
    HS2-works-Chalfont-St-Giles-032.jpg
  • Chalfont St Giles, UK. 18th July, 2020. A temporary haul road is prepared for use in the construction of a ventilation shaft for the Chiltern Tunnel on the HS2 high-speed rail link. The Department for Transport approved the issuing of Notices to Proceed by HS2 Ltd to the four Main Works Civils Contractors (MWCC) working on the £106bn rail project in April 2020.
    HS2-works-Chalfont-St-Giles-027.jpg
  • Chalfont St Giles, UK. 18th July, 2020. A new Affinity Water pipeline is constructed between Chalfont St Giles and Amersham in conjunction with the HS2 high-speed rail link. The pipeline is being constructed to protect against the creation of turbidity, or cloudy water, in the water supply due to tunnelling and piledriving activities on the HS2 project.
    HS2-works-Chalfont-St-Giles-023.jpg
  • A temporary haul road is prepared for HGVs to use in the construction of a ventilation shaft for the Chiltern Tunnel on the HS2 high-speed rail link on 18th July 2020 in Chalfont St Giles, United Kingdom. The Department for Transport approved the issuing of Notices to Proceed by HS2 Ltd to the four Main Works Civils Contractors (MWCC) working on the £106bn rail project in April 2020.
    HS2-works-Chalfont-St-Giles-017.jpg
  • A sign indicates the site of a ventilation shaft for the Chiltern Tunnel on the HS2 high-speed rail link on 18th July 2020 in Chalfont St Peter, United Kingdom. The Department for Transport approved the issuing of Notices to Proceed by HS2 Ltd to the four Main Works Civils Contractors (MWCC) working on the £106bn rail project in April 2020.
    HS2-works-Chalfont-St-Peter-001.jpg
  • Earth is piled up at the site of a ventilation shaft for the Chiltern Tunnel on the HS2 high-speed rail link on 18th July 2020 in Chalfont St Giles, United Kingdom. The Department for Transport approved the issuing of Notices to Proceed by HS2 Ltd to the four Main Works Civils Contractors (MWCC) working on the £106bn rail project in April 2020.
    HS2-works-Chalfont-St-Giles-012.jpg
  • A temporary haul road is prepared for HGVs to use in the construction of a ventilation shaft for the Chiltern Tunnel on the HS2 high-speed rail link on 18th July 2020 in Chalfont St Giles, United Kingdom. The Department for Transport approved the issuing of Notices to Proceed by HS2 Ltd to the four Main Works Civils Contractors (MWCC) working on the £106bn rail project in April 2020.
    HS2-works-Chalfont-St-Giles-011.jpg
  • A temporary haul road is prepared for HGVs to use in the construction of a ventilation shaft for the Chiltern Tunnel on the HS2 high-speed rail link on 18th July 2020 in Chalfont St Giles, United Kingdom. The Department for Transport approved the issuing of Notices to Proceed by HS2 Ltd to the four Main Works Civils Contractors (MWCC) working on the £106bn rail project in April 2020.
    HS2-works-Chalfont-St-Giles-008.jpg
  • Denham, UK. 11th September, 2020. A banner placed by environmental activists from HS2 Rebellion at Denham Protection Camp. Anti-HS2 activists continue to try to prevent or delay works on the controversial £106bn HS2 high-speed rail link from a series of such protection camps based along the route of the line between London and Birmingham.
    HS2-Denham-Green-camp-works-008.jpg
  • A tree protector from HS2 Rebellion climbs a tree at Denham Protection Camp on 11 September 2020 in Denham, United Kingdom. Anti-HS2 activists continue to try to prevent or delay works on the controversial £106bn HS2 high-speed rail link from a series of such protection camps based along the route of the line between London and Birmingham.
    HS2-Denham-Green-camp-works-001.jpg
  • Chalfont St Giles, UK. 18th July, 2020. A temporary haul road is prepared for use in the construction of a ventilation shaft for the Chiltern Tunnel on the HS2 high-speed rail link. The Department for Transport approved the issuing of Notices to Proceed by HS2 Ltd to the four Main Works Civils Contractors (MWCC) working on the £106bn rail project in April 2020.
    HS2-works-Chalfont-St-Giles-020.jpg
  • A temporary haul road is prepared for HGVs to use in the construction of a ventilation shaft for the Chiltern Tunnel on the HS2 high-speed rail link on 18th July 2020 in Chalfont St Giles, United Kingdom. The Department for Transport approved the issuing of Notices to Proceed by HS2 Ltd to the four Main Works Civils Contractors (MWCC) working on the £106bn rail project in April 2020.
    HS2-works-Chalfont-St-Giles-007.jpg
  • A new Affinity Water pipeline is constructed between Chalfont St Giles and Amersham in conjunction with the HS2 high-speed rail link on 18th July 2020 in Chalfont St Giles, United Kingdom. The pipeline is being constructed to protect against the creation of turbidity, or cloudy water, in the water supply due to tunnelling and piledriving activities on the HS2 project.
    HS2-works-Chalfont-St-Giles-004.jpg
  • Steeple Claydon, UK. 24 February, 2021. Trees felled by HS2 Ltd using a long reach tree felling vehicle in ancient woodland known as Poors Piece are pictured during the eviction of activists opposed to the HS2 high-speed rail link. The activists created the Poors Piece Conservation Project there in spring 2020 after having been invited to stay on the land by its owner, farmer Clive Higgins. Already, local village communities have been hugely impacted by HS2, with 550 acres of land seized including a large section of a nature reserve.
    HS2-Poors-Piece-eviction-Day2-008.jpg
  • Steeple Claydon, UK. 23 February, 2021. National Eviction Team bailiffs acting for HS2 Ltd use a cherry picker to cut a branch beneath an activist during an operation to evict activists opposed to the HS2 high-speed rail link from ancient woodland known as Poors Piece. The activists created the Poors Piece Conservation Project there in spring 2020 after having been invited to stay on the land by its owner, farmer Clive Higgins. Already, local village communities have been hugely impacted by HS2, with 550 acres of land seized including a large section of a nature reserve.
    HS2-eviction-Poors-Piece-Day1-032.jpg
  • Steeple Claydon, UK. 23 February, 2021. An anti-HS2 activist recites a poem from a tree house during an operation by National Eviction Team bailiffs acting for HS2 Ltd to evict activists living in ancient woodland known as Poors Piece. The activists created the Poors Piece Conservation Project there in spring 2020 after having been invited to stay on the land by its owner, farmer Clive Higgins. Already, local village communities have been hugely impacted by HS2, with 550 acres of land seized including a large section of a nature reserve.
    HS2-eviction-Poors-Piece-Day1-014.jpg
  • Wendover, UK. 20th February, 2021. A banner criticising the use of compulsory purchase orders hangs from the exterior of the Wendover Active Resistance Camp which is occupied by activists opposed to the HS2 high-speed rail link from HS2 Rebellion. A chain of such camps has been built by environmental activists along the planned route of the rail project from Euston in London to Birmingham.
    HS2-Wendover-Small-Dean-Lane-017.jpg
  • Wendover, UK. 20th February, 2021. A view of some of the exterior of the Wendover Active Resistance Camp which is occupied by activists opposed to the HS2 high-speed rail link from HS2 Rebellion. A chain of such camps has been built by environmental activists along the planned route of the rail project from Euston in London to Birmingham.
    HS2-Wendover-Small-Dean-Lane-018.jpg
  • Wendover, UK. 20th February, 2021. An area of woodland alongside Small Dean Lane which is currently being cleared  by HS2 Ltd for the HS2 high-speed rail link. Anti-HS2 activists continue to occupy the Wendover Active Resistance Camp on the opposite side of the rail line from the woodland.
    HS2-Wendover-Small-Dean-Lane-006.jpg
  • Wendover, UK. 20th February, 2021. HS2 security workers guard an area of woodland alongside Small Dean Lane which is currently being cleared for the HS2 high-speed rail link. Anti-HS2 activists continue to occupy the Wendover Active Resistance Camp on the opposite side of the rail line from the woodland.
    HS2-Wendover-Small-Dean-Lane-008.jpg
  • Wendover, UK. 20th February, 2021. A road sign warns of works traffic for the HS2 high-speed rail link close to the A413 to Aylesbury.
    HS2-Wendover-Small-Dean-Lane-027.jpg
  • Wendover, UK. 20th February, 2021. HS2 security workers guard an area of woodland alongside Small Dean Lane which is currently being cleared for the HS2 high-speed rail link. Anti-HS2 activists continue to occupy the Wendover Active Resistance Camp on the opposite side of the rail line from the woodland.
    HS2-Wendover-Small-Dean-Lane-005.jpg
  • Harefield, UK. 13th February, 2021. A view across a frozen Grand Union Canal towards an area of Denham Country Park almost cleared of mature trees by contractors working on behalf of HS2 Ltd for pylon relocation works connected to the HS2 high-speed rail link.
    Denham-Country-Park-HS2-005.jpg
  • Denham, UK. 13th February, 2021. Flooded wet woodland in Denham Country Park. Two areas of Denham Country Park have been cleared of trees by contractors working on behalf of HS2 Ltd to relocate a pylon in connection with the HS2 high-speed rail link.
    Denham-Country-Park-003.jpg
  • Harefield, UK. 13th February, 2021. A sign indicates the closure of Harvil Road in the Colne Valley in order to facilitate the felling of some of the few remaining trees in the area for the HS2 high-speed rail link. Four anti-HS2 activists had been evicted from a roadside camp and three from nearby trees by bailiffs acting for HS2 Ltd during the night.
    HS2-Harvil-Road-camp-eviction-001.jpg
  • London, UK. 6th February, 2021. National Eviction Team bailiffs take part in an operation to remove environmental activists from anti-HS2 campaign group HS2 Rebellion from tunnels beneath Euston Square Gardens. The activists entered tunnels dug by them beneath the site eleven days ago in order to seek to protect trees from felling in connection with the HS2 high-speed rail project.
    HS2-Euston-tunnels-bailiffs-017.jpg
  • A banner reading ‘Save Euston Trees - Heal Not Harm’ hangs from the Friends House on Euston Road on 6th February 2021 in London, United Kingdom. The banner was hung by environmental activists from anti-HS2 campaign group HS2 Rebellion in solidarity with fellow activists occupying tunnels beneath Euston Square Gardens in order to seek to protect trees from felling in connection with the HS2 high-speed rail project.
    HS2-Euston-tunnels-bailiffs-004.jpg
  • Environmental activists from HS2 Rebellion attend a candlelit vigil for the trees lost, or about to felled, for the HS2 high-speed rail project in Euston Square Gardens on 6 February 2021 in London, United Kingdom. The vigil took place alongside the site of a tunnel in Euston Square Gardens from which bailiffs contracted to HS2 Ltd have been trying to evict nine activists seeking to protect the trees for the past eleven days and also marked the first anniversary of the death of environmental activist Iggy Fox.
    HS2-Rebellion-Vigil-Euston-001.jpg
  • A tree felled in Euston Square Gardens for the HS2 high-speed rail link project is pictured on 6 February 2021 in London, United Kingdom. Environmental activists from HS2 Rebellion have been occupying tunnels beneath the site for the past eleven days in order to try to delay or prevent the felling of the trees.
    HS2-Rebellion-Vigil-Euston-015.jpg
  • Environmental activists from HS2 Rebellion attend a candlelit vigil for the trees lost, or about to felled, for the HS2 high-speed rail project in Euston Square Gardens on 6 February 2021 in London, United Kingdom. The vigil took place alongside the site of a tunnel in Euston Square Gardens from which bailiffs contracted to HS2 Ltd have been trying to evict nine activists seeking to protect the trees for the past eleven days and also marked the first anniversary of the death of environmental activist Iggy Fox.
    HS2-Rebellion-Vigil-Euston-010.jpg
  • London, UK. 26th June 2018. Local residents protest using art against the planned felling by HS2 Ltd of mature London Plane, Red Oak, Common Lime, Common Whitebeam and Wild Service trees in Euston Square Gardens to make way for temporary sites for construction vehicles and a displaced taxi rank as part of preparations for the HS2 high-speed rail line. The protest, involving the capturing of images of the trees on paper using a variety of different techniques, was hosted by the artist Dan Llywelyn Hall as 'The Last Stand Against the Environmental Damage of HS2'.
    HS2-Euston-Square-art-protest_016.jpg
  • London, UK. 26th June 2018. Works continue in Euston Square Gardens involving the planned felling by HS2 Ltd of mature London Plane, Red Oak, Common Lime, Common Whitebeam and Wild Service trees to make way for temporary sites for construction vehicles and a displaced taxi rank as part of preparations for the HS2 high-speed rail line. Local residents and campaigners have attached knitted bands to the trees in protest against their planned felling.
    HS2-Euston-Square-art-protest_009.jpg
  • London, UK. 13th January, 2018. A sign indicating the closure of St James's Gardens for work on the HS2 high-speed rail link. Around 50 London Plane, Common Ash, Italian Alder, Common Lime, Bird Cherry, Wild Cherry and Sugar Maple trees in St James's Gardens have been felled as part of preparations for HS2 and an estimated 30,000-60,000 bodies will be exhumed from the cemetery there.
    HS2-St-James-Gardens-Euston-004.jpg
  • London, UK. 31 January, 2021. Climbers from the National Eviction Team (NET) dismantle a camp in Euston Square Gardens built by anti-HS2 activists from umbrella campaign group HS2 Rebellion seeking to protect trees there from felling by HS2 Ltd in connection with the controversial HS2 high-speed rail project. Five activists continue to occupy tunnels beneath the camp, including Dan Hooper who was known as the roads protester Swampy during the 1990s.
    HS2-Rebellion-Battle-Euston-015.jpg
  • London, UK. 31 January, 2021. A banner hung by anti-HS2 activists on Euston Road calling for HS2 Ltd to stop felling trees in Euston Square Gardens and for members of the public to sign a petition started by Chris Packham. Climbers from the National Eviction Team (NET) are currently dismantling a camp built by activists from HS2 Rebellion, five of whom in tunnels beneath, seeking to protect trees from felling in connection with the controversial HS2 high-speed rail project.
    HS2-Rebellion-Battle-Euston-008.jpg
  • London, UK. 13th January, 2018. Trees in Euston Square Gardens are wrapped with hand-knitted scarves. Activists opposed to the HS2 high-speed rail link have ‘yarn-bombed’ many of the mature London Plane, Red Oak, Common Whitebeam, Common Lime and Wild Service trees in Euston Square Gardens expected to be felled to make way for temporary sites for construction vehicles and a displaced taxi rank as part of preparations for the controversial HS2 project in order to draw attention to their fate.
    HS2-Euston-trees-yarnbombing-023.jpg
  • London, UK. 13th January, 2018. A tree in Euston Square Gardens is wrapped with a hand-knitted scarf. Activists opposed to the HS2 high-speed rail link have ‘yarn-bombed’ many of mature London Plane, Red Oak, Common Whitebeam, Common Lime and Wild Service trees in Euston Square Gardens expected to be felled to make way for temporary sites for construction vehicles and a displaced taxi rank as part of preparations for the controversial HS2 project in order to draw attention to their fate.
    HS2-Euston-trees-yarnbombing-026.jpg
  • London, UK. 13th January, 2018. Members of the public coming from Euston Station pass by trees in Euston Square Gardens wrapped with hand-knitted scarves. Activists opposed to the HS2 high-speed rail link have ‘yarn-bombed’ many of the mature London Plane, Red Oak, Common Whitebeam, Common Lime and Wild Service trees in Euston Square Gardens expected to be felled to make way for temporary sites for construction vehicles and a displaced taxi rank as part of preparations for the controversial HS2 project in order to draw attention to their fate.
    HS2-Euston-trees-yarnbombing-030.jpg
  • London, UK. 12th January, 2018. Anne Stevens (r), the vicar of St Pancras church, stands chained with local resident Jo Hurford (l) to a tree outside Euston station during a protest against the HS2 high-speed rail link. The protest formed part of a campaign by local residents against the planned felling of mature London Plane, Red Oak, Common Whitebeam, Common Lime and Wild Service trees in Euston Square Gardens to make way for temporary HS2 sites for construction vehicles and a displaced taxi rank.
    HS2-Euston-Square-Gardens-005.jpg
  • London, UK. 12th January, 2018. An anti-HS2 stall is pictured in Euston Square Gardens. Local residents and environmental campaigners are protesting against the planned felling of mature London Plane, Red Oak, Common Whitebeam, Common Lime and Wild Service trees in Euston Square Gardens to make way for temporary sites for construction vehicles and a displaced taxi rank as part of preparations for the HS2 high-speed rail line.
    HS2-Euston-Square-Gardens-013.jpg
  • London, UK. 12th January, 2018. An activist stands holding an anti-HS2 sign in Euston Square Gardens. Local residents and environmental campaigners are protesting against the planned felling of mature London Plane, Red Oak, Common Whitebeam, Common Lime and Wild Service trees in Euston Square Gardens to make way for temporary sites for construction vehicles and a displaced taxi rank as part of preparations for the HS2 high-speed rail line.
    HS2-Euston-Square-Gardens-006.jpg
  • Denham, UK. 8th December, 2020. Hampshire Police officers remove an anti-HS2 activist from the river Colne for arrest whilst pushing another activist down towards the water during a large security operation to extract Dan Hooper, widely known as Swampy in the 1990s, from a bamboo tripod which he had occupied the previous day in order to delay the building of a bridge as part of works for the controversial HS2 high-speed rail link.
    HS2-Hampshire-police-029.jpg
  • Denham, UK. 8th December, 2020. Hampshire Police officers remove an anti-HS2 activist from the river Colne for arrest during a large security operation to extract Dan Hooper, widely known as Swampy in the 1990s, from a bamboo tripod which he had occupied the previous day in order to delay the building of a bridge as part of works for the controversial HS2 high-speed rail link.
    HS2-Hampshire-police-028.jpg
  • Aylesbury Vale, UK. 1st October, 2020. National Eviction Team bailiffs working on behalf of HS2 Ltd forcibly move an anti-HS2 activist away from a fence being constructed during evictions from a wildlife protection camp in the ancient woodland which inspired Roald Dahl’s Fantastic Mr Fox at Jones’ Hill Wood. Around 40 environmental activists and local residents, some of whom living in makeshift tree houses 60 feet above the ground, were present during the evictions at Jones’ Hill Wood which had served as one of several protest camps set up along the route of the £106bn HS2 high-speed rail link in order to resist the controversial infrastructure project.
    HS2-National-Eviction-Team-022.jpg
  • Denham, UK. 24 July, 2020. A large section of branch from an ancient alder tree cut by a tree surgeon working with the National Eviction Team falls into the river Colne close to environmental activists from HS2 Rebellion trying to protect the tree from destruction in connection with works for the HS2 high-speed rail link in Denham Country Park. 2020 is the Year of the Tree. The Metropolitan Police, Thames Valley Police, City of London Police and Hampshire Police were in attendance to enable HS2 to remove the tree.
    HS2-National-Eviction-Team-008.jpg
  • Denham, UK. 24th July, 2020. Environmental activists from HS2 Rebellion, including Swan (l) and Larch (r) on a line above the shallow river Colne, try to protect an ancient alder tree from destruction in connection with works for the HS2 high-speed rail link in Denham Country Park. A large policing operation involving the Metropolitan Police, Thames Valley Police, City of London Police and Hampshire Police as well as the National Eviction Team was put in place to enable HS2 to remove the tree.
    20-images-2020-Mark-Kerrison-001.jpg
  • Denham, UK. 6th February, 2020. Environmental activists from Save the Colne Valley, Stop HS2 and Extinction Rebellion walk at a snail’s pace along a road in order to block a security vehicle and truck delivering fencing and other supplies to be used for works associated with the HS2 high-speed rail link close to the river Colne at Denham Ford. Works planned in the immediate vicinity include the felling of trees and the construction of a Bailey bridge, compounds and fencing, some of which in a wetland nature reserve adjacent to a Site of Metropolitan Importance for Nature Conservation (SMI).
    20-images-2020-Mark-Kerrison-017.jpg
  • Denham, UK. 8th December, 2020. Hampshire Police officers remove an anti-HS2 activist from the river Colne for arrest whilst pushing another activist down towards the water during a large security operation to extract Dan Hooper, widely known as Swampy in the 1990s, from a bamboo tripod which he had occupied the previous day in order to delay the building of a bridge as part of works for the controversial HS2 high-speed rail link.
    HS2-Swampy-arrest-Denham-040.jpg
  • Denham, UK. 8th December, 2020. Dan Hooper, widely known as Swampy during the 1990s, smiles as he holds a lock-on arm tube on a bamboo tripod positioned in the river Colne. The climate and roads activist had occupied the tripod the previous day in order to delay the building of a bridge as part of works for the controversial HS2 high-speed rail link and a large security operation involving officers from at least three police forces, the National Eviction Team and HS2 security guards was put in place to facilitate his removal.
    HS2-Swampy-arrest-Denham-011.jpg
  • Denham, UK. 8th December, 2020. HS2 security guards form a line across the River Colne in front of Dan Hooper, widely known as Swampy during the 1990s. The climate and roads activist had occupied a bamboo tripod the previous day in order to delay the building of a bridge as part of works for the controversial HS2 high-speed rail link and a large security operation involving officers from at least three police forces, the National Eviction Team and HS2 security guards was put in place to facilitate his removal.
    HS2-Swampy-arrest-Denham-004.jpg
  • Denham, UK. 8th December, 2020. HS2 security guards form a line across the River Colne in front of Dan Hooper, widely known as Swampy during the 1990s. The climate and roads activist had occupied a bamboo tripod the previous day in order to delay the building of a bridge as part of works for the controversial HS2 high-speed rail link and a large security operation involving officers from at least three police forces, National Eviction Team enforcement agents and HS2 security guards was put in place to facilitate his removal.
    HS2-Swampy-arrest-Denham-005.jpg
  • Bailiffs abseil from a large cherry picker towards Dan Hooper, widely known as Swampy during the 1990s, who is sitting on a bamboo tripod positioned in the river Colne on 8th December 2020 in Denham, United Kingdom. The climate and roads activist had occupied the tripod the previous day in order to delay the building of a bridge as part of works for the controversial HS2 high-speed rail link and a large security operation involving officers from at least three police forces, National Eviction Team enforcement agents and HS2 security guards was put in place to facilitate his removal.
    HS2-Swampy-arrest-Denham-025.jpg
  • Denham, UK. 7th December, 2020. HS2 security guards are seen through a barricade at Denham Ford Protection Camp. Anti-HS2 activists continue to resist the controversial £106bn high-speed rail project from a series of protest camps based along its initial route between London and Birmingham.
    HS2-Denham-bridge-Swampy-010.jpg
  • Denham, UK. 7th December, 2020. Anti-HS2 activists in Denham Ford Protection Camp observe contractors and security guards working on the foundations of a bridge across the river Colne in connection with the HS2 high-speed rail link. Activists continue to resist the controversial £106bn rail project from a series of protest camps based along its initial route between London and Birmingham.
    HS2-Denham-bridge-Swampy-019.jpg
  • Denham, UK. 7th December, 2020. HS2 security guards observe Dan Hooper, better known as roads protester Swampy during the 1990s, sitting on a tripod positioned in the river Colne in order to try to delay bridge building works in connection with the HS2 high-speed rail link. Anti-HS2 activists continue to resist the controversial £106bn rail project from a series of protest camps based along its initial route between London and Birmingham.
    HS2-Denham-bridge-Swampy-018.jpg
Next