• Facebook
  • Twitter
x

MARK KERRISON | Photojournalist

  • Live News Feed
  • Slideshows
  • About
    • About
    • Data Protection
    • Terms and Conditions
  • Contact
Show Navigation
Cart Lightbox Client Area

Search Results

Refine Search
Match all words
Match any word
Prints
Personal Use
Royalty-Free
Rights-Managed
(leave unchecked to
search all images)
{ 10 images found }
twitterlinkedinfacebook

Loading ()...

  • Two anti-HS2 activists with a NHS not HS2 banner, one of whom secured with a large rope around his neck, block a HGV used for works connected to the HS2 high-speed rail link on 28 September 2020 in Denham, United Kingdom. Environmental activists continue to try to prevent or delay works on the controversial £106bn project for which the construction phase was announced on 4th September from a series of protection camps based along the route of the line between London and Birmingham.
    HS2-Denham-HGV-block-rope-016.jpg
  • A sign calling for expenditure on the NHS instead of HS2 stands alongside on the road at the Stop HS2 Great Missenden roadside camp on 17th July 2020 in Great Missenden, United Kingdom. Environmental activists from groups including Stop HS2 and HS2 Rebellion continue to protest against HS2, which is currently projected to cost £106bn and which will remain a net contributor to CO2 emissions during its projected 120-year lifespan, on environmental and economic grounds.
    Great-Missenden-Stop-HS2-camp-002.jpg
  • Two anti-HS2 activists with a NHS not HS2 banner, one of whom secured with a large rope around his neck, block a HGV used for works connected to the HS2 high-speed rail link on 28 September 2020 in Denham, United Kingdom. Environmental activists continue to try to prevent or delay works on the controversial £106bn project for which the construction phase was announced on 4th September from a series of protection camps based along the route of the line between London and Birmingham.
    HS2-Denham-HGV-block-rope-022.jpg
  • Two anti-HS2 activists with a NHS not HS2 banner, one of whom secured with a large rope around his neck, block a HGV used for works connected to the HS2 high-speed rail link on 28 September 2020 in Denham, United Kingdom. Environmental activists continue to try to prevent or delay works on the controversial £106bn project for which the construction phase was announced on 4th September from a series of protection camps based along the route of the line between London and Birmingham.
    HS2-Denham-HGV-block-rope-006.jpg
  • Two anti-HS2 activists with a NHS not HS2 banner, one of whom secured with a large rope around his neck, block a HGV used for works connected to the HS2 high-speed rail link on 28 September 2020 in Denham, United Kingdom. Environmental activists continue to try to prevent or delay works on the controversial £106bn project for which the construction phase was announced on 4th September from a series of protection camps based along the route of the line between London and Birmingham.
    HS2-Denham-HGV-block-rope-004.jpg
  • Harefield, UK. 13 July, 2020. A sign at the Harvil Road protection camp indicates the possible danger to London’s water supply if HS2 drills into the chalk aquifer in the Colne Valley. This was the first camp established by environmental activists to fight against the HS2 high-speed rail link.
    HS2-Harefield-clearance-trees-011.jpg
  • A Thames Valley Police officer speaks to an anti-HS2 activist secured with a large rope around his neck who is blocking a HGV used for works connected to the HS2 high-speed rail link on 28 September 2020 in Denham, United Kingdom. Environmental activists continue to try to prevent or delay works on the controversial £106bn project for which the construction phase was announced on 4th September from a series of protection camps based along the route of the line between London and Birmingham.
    HS2-Denham-HGV-block-rope-024.jpg
  • A Thames Valley Police officer speaks to an anti-HS2 activist secured with a large rope around his neck who is blocking a HGV used for works connected to the HS2 high-speed rail link on 28 September 2020 in Denham, United Kingdom. Environmental activists continue to try to prevent or delay works on the controversial £106bn project for which the construction phase was announced on 4th September from a series of protection camps based along the route of the line between London and Birmingham.
    HS2-Denham-HGV-block-rope-011.jpg
  • West Hyde, UK. 14th September, 2020. Environmental activists from HS2 Rebellion stand holding a NHS Not HS2 banner close to the South Portal site for the HS2 high-speed rail link. Anti-HS2 activists blocked two gates to the same site for the controversial £106bn rail link, one remaining closed for over six hours and another for over nineteen hours.
    HS2-South-Portal-gates-block-051.jpg
  • Two anti-HS2 activists stand with a NHS Not HS2 placard during evictions by National Eviction Team bailiffs working on behalf of HS2 Ltd from a wildlife protection camp in the ancient woodland which inspired Roald Dahl’s Fantastic Mr Fox at Jones’ Hill Wood on 1 October 2020 in Aylesbury Vale, United Kingdom. Around 40 environmental activists and local residents, some of whom living in tree houses 60 feet above the ground, were present during the evictions at Jones’ Hill Wood which had served as one of several protest camps set up along the route of the £106bn HS2 high-speed rail link in order to resist the controversial infrastructure project.
    HS2-Jones-Hill-Woods-eviction-011.jpg