• Facebook
  • Twitter
x

MARK KERRISON | Photojournalist

  • Live News Feed
  • Slideshows
  • About
    • About
    • Data Protection
    • Terms and Conditions
  • Contact
Show Navigation
Cart Lightbox Client Area

Search Results

Refine Search
Match all words
Match any word
Prints
Personal Use
Royalty-Free
Rights-Managed
(leave unchecked to
search all images)
Next
{ 373 images found }
twitterlinkedinfacebook

Loading ()...

  • Denham, UK. 5th November, 2020. HS2 security guards push a female anti-HS2 activist into the river Colne at Denham Ford during bridge building works for the HS2 high-speed rail link on the first day of the second national coronavirus lockdown. Prime Minister Boris Johnson has advised that construction work may continue during the second lockdown but those working on construction projects are required to adhere to Site Operating Procedures including social distancing guidelines to help prevent the spread of COVID-19.
    MK-20201105-HS2-Denham-Ford-bridge-w...jpg
  • HS2 security guards push a female anti-HS2 activist into the river Colne at Denham Ford during bridge building works for the HS2 high-speed rail link on the first day of the second national coronavirus lockdown on 5 November 2020 in Denham, United Kingdom. Prime Minister Boris Johnson has advised that construction work may continue during the second lockdown but those working on construction projects are required to adhere to Site Operating Procedures including social distancing guidelines to help prevent the spread of COVID-19.
    HS2-Denham-bridge-building-008.jpg
  • HS2 security guards monitor anti-HS2 activists wading in the river Colne at Denham Ford in order to try to delay bridge building works for the HS2 high-speed rail link on the first day of the second national coronavirus lockdown on 5 November 2020 in Denham, United Kingdom. Prime Minister Boris Johnson has advised that construction work may continue during the second lockdown but those working on construction projects are required to adhere to Site Operating Procedures including social distancing guidelines to help prevent the spread of COVID-19.
    HS2-Denham-bridge-building-012.jpg
  • HS2 security guards monitor an anti-HS2 activist swimming in the Grand Union Canal to halt tree felling works alongside HOAC lake in connection with the HS2 high-speed rail link on 21 September 2020 in Harefield, United Kingdom. Anti-HS2 activists continue to try to prevent or delay works for the controversial £106bn HS2 high-speed rail link on environmental and cost grounds from a series of protection camps based along the route of the line between London and Birmingham.
    HS2-tree-felling-canal-swim-001.jpg
  • A female anti-HS2 activist stands up after having been pushed by HS2 security guards into the river Colne at Denham Ford during bridge building works for the HS2 high-speed rail link on the first day of the second national coronavirus lockdown on 5 November 2020 in Denham, United Kingdom. Prime Minister Boris Johnson has advised that construction work may continue during the second lockdown but those working on construction projects are required to adhere to Site Operating Procedures including social distancing guidelines to help prevent the spread of COVID-19.
    HS2-Denham-bridge-building-022.jpg
  • HS2 security guards push a female anti-HS2 activist into the river Colne at Denham Ford during bridge building works for the HS2 high-speed rail link on the first day of the second national coronavirus lockdown on 5 November 2020 in Denham, United Kingdom. Prime Minister Boris Johnson has advised that construction work may continue during the second lockdown but those working on construction projects are required to adhere to Site Operating Procedures including social distancing guidelines to help prevent the spread of COVID-19.
    HS2-Denham-bridge-building-009.jpg
  • HS2 security guards push a female anti-HS2 activist into the river Colne at Denham Ford during bridge building works for the HS2 high-speed rail link on the first day of the second national coronavirus lockdown on 5 November 2020 in Denham, United Kingdom. Prime Minister Boris Johnson has advised that construction work may continue during the second lockdown but those working on construction projects are required to adhere to Site Operating Procedures including social distancing guidelines to help prevent the spread of COVID-19.
    HS2-Denham-bridge-building-006.jpg
  • HS2 security guards push a female anti-HS2 activist into the river Colne at Denham Ford during bridge building works for the HS2 high-speed rail link on the first day of the second national coronavirus lockdown on 5 November 2020 in Denham, United Kingdom. Prime Minister Boris Johnson has advised that construction work may continue during the second lockdown but those working on construction projects are required to adhere to Site Operating Procedures including social distancing guidelines to help prevent the spread of COVID-19.
    HS2-Denham-bridge-building-003.jpg
  • HS2 security guards push a female anti-HS2 activist into the river Colne at Denham Ford during bridge building works for the HS2 high-speed rail link on the first day of the second national coronavirus lockdown on 5 November 2020 in Denham, United Kingdom. Prime Minister Boris Johnson has advised that construction work may continue during the second lockdown but those working on construction projects are required to adhere to Site Operating Procedures including social distancing guidelines to help prevent the spread of COVID-19.
    HS2-Denham-bridge-building-002.jpg
  • HS2 security guards monitor an anti-HS2 activist wading in the river Colne at Denham Ford in order to try to delay bridge building works for the HS2 high-speed rail link on 5 November 2020 in Denham, United Kingdom. Prime Minister Boris Johnson has advised that construction work may continue during the second national coronavirus lockdown but those working on construction projects are required to adhere to Site Operating Procedures including social distancing guidelines to help prevent the spread of COVID-19.
    HS2-Denham-bridge-building-011.jpg
  • HS2 security guards monitor an anti-HS2 activist swimming in the Grand Union Canal to halt tree felling works alongside HOAC lake in connection with the HS2 high-speed rail link on 21 September 2020 in Harefield, United Kingdom. Anti-HS2 activists continue to try to prevent or delay works for the controversial £106bn HS2 high-speed rail link on environmental and cost grounds from a series of protection camps based along the route of the line between London and Birmingham.
    HS2-tree-felling-canal-swim-018.jpg
  • HS2 security guards monitor an anti-HS2 activist standing in the Grand Union Canal to halt tree felling works alongside HOAC lake in connection with the HS2 high-speed rail link on 21 September 2020 in Harefield, United Kingdom. Anti-HS2 activists continue to try to prevent or delay works for the controversial £106bn HS2 high-speed rail link on environmental and cost grounds from a series of protection camps based along the route of the line between London and Birmingham.
    HS2-tree-felling-canal-swim-004.jpg
  • Denham, UK. 5th November, 2020. HS2 security guards push a female anti-HS2 activist into the river Colne at Denham Ford during bridge building works for the HS2 high-speed rail link on the first day of the second national coronavirus lockdown. Prime Minister Boris Johnson has advised that construction work may continue during the second lockdown but those working on construction projects are required to adhere to Site Operating Procedures including social distancing guidelines to help prevent the spread of COVID-19.
    MK-20201105-HS2-Denham-Ford-bridge-w...jpg
  • Denham, UK. 5th November, 2020. HS2 security guards monitor anti-HS2 activists standing in the river Colne at Denham Ford in order to try to delay bridge building works for the HS2 high-speed rail link on the first day of the second national coronavirus lockdown. Prime Minister Boris Johnson has advised that construction work may continue during the second lockdown but those working on construction projects are required to adhere to Site Operating Procedures including social distancing guidelines to help prevent the spread of COVID-19.
    HS2-Denham-bridge-building-018.jpg
  • HS2 security guards push a female anti-HS2 activist into the river Colne at Denham Ford during bridge building works for the HS2 high-speed rail link on the first day of the second national coronavirus lockdown on 5 November 2020 in Denham, United Kingdom. Prime Minister Boris Johnson has advised that construction work may continue during the second lockdown but those working on construction projects are required to adhere to Site Operating Procedures including social distancing guidelines to help prevent the spread of COVID-19.
    HS2-Denham-bridge-building-001.jpg
  • HS2 security guards stand behind female anti-HS2 activists in the river Colne at Denham Ford during bridge building works for the HS2 high-speed rail link on the first day of the second national coronavirus lockdown on 5 November 2020 in Denham, United Kingdom. Prime Minister Boris Johnson has advised that construction work may continue during the second lockdown but those working on construction projects are required to adhere to Site Operating Procedures including social distancing guidelines to help prevent the spread of COVID-19.
    HS2-Denham-bridge-building-021.jpg
  • HS2 security guards monitor an anti-HS2 activist standing in the Grand Union Canal to halt tree felling works alongside HOAC lake in connection with the HS2 high-speed rail link on 21 September 2020 in Harefield, United Kingdom. Anti-HS2 activists continue to try to prevent or delay works for the controversial £106bn HS2 high-speed rail link on environmental and cost grounds from a series of protection camps based along the route of the line between London and Birmingham.
    HS2-tree-felling-canal-swim-002.jpg
  • HS2 security guards monitor two anti-HS2 activists swimming in the Grand Union Canal to halt tree felling works alongside HOAC lake in connection with the HS2 high-speed rail link on 21 September 2020 in Harefield, United Kingdom. Anti-HS2 activists continue to try to prevent or delay works for the controversial £106bn HS2 high-speed rail link on environmental and cost grounds from a series of protection camps based along the route of the line between London and Birmingham.
    HS2-tree-felling-canal-swim-013.jpg
  • HS2 security guards push a female anti-HS2 activist into the river Colne at Denham Ford during bridge building works for the HS2 high-speed rail link on the first day of the second national coronavirus lockdown on 5 November 2020 in Denham, United Kingdom. Prime Minister Boris Johnson has advised that construction work may continue during the second lockdown but those working on construction projects are required to adhere to Site Operating Procedures including social distancing guidelines to help prevent the spread of COVID-19.
    HS2-Denham-bridge-building-007.jpg
  • HS2 security guards push a female anti-HS2 activist into the river Colne at Denham Ford during bridge building works for the HS2 high-speed rail link on the first day of the second national coronavirus lockdown on 5 November 2020 in Denham, United Kingdom. Prime Minister Boris Johnson has advised that construction work may continue during the second lockdown but those working on construction projects are required to adhere to Site Operating Procedures including social distancing guidelines to help prevent the spread of COVID-19.
    HS2-Denham-bridge-building-005.jpg
  • A female anti-HS2 activist tries to stand up after having been pushed by HS2 security guards into the river Colne at Denham Ford during bridge building works for the HS2 high-speed rail link on the first day of the second national coronavirus lockdown on 5 November 2020 in Denham, United Kingdom. Prime Minister Boris Johnson has advised that construction work may continue during the second lockdown but those working on construction projects are required to adhere to Site Operating Procedures including social distancing guidelines to help prevent the spread of COVID-19.
    HS2-Denham-bridge-building-010.jpg
  • HS2 security guards push a female anti-HS2 activist in the river Colne at Denham Ford during bridge building works for the HS2 high-speed rail link on the first day of the second national coronavirus lockdown on 5 November 2020 in Denham, United Kingdom. Prime Minister Boris Johnson has advised that construction work may continue during the second lockdown but those working on construction projects are required to adhere to Site Operating Procedures including social distancing guidelines to help prevent the spread of COVID-19.
    HS2-Denham-bridge-building-015.jpg
  • HS2 security guards monitor two anti-HS2 activists swimming in the Grand Union Canal to halt tree felling works alongside HOAC lake in connection with the HS2 high-speed rail link on 21 September 2020 in Harefield, United Kingdom. Anti-HS2 activists continue to try to prevent or delay works for the controversial £106bn HS2 high-speed rail link on environmental and cost grounds from a series of protection camps based along the route of the line between London and Birmingham.
    HS2-tree-felling-canal-swim-015.jpg
  • HS2 security guards push a female anti-HS2 activist into the river Colne at Denham Ford during bridge building works for the HS2 high-speed rail link on the first day of the second national coronavirus lockdown on 5 November 2020 in Denham, United Kingdom. Prime Minister Boris Johnson has advised that construction work may continue during the second lockdown but those working on construction projects are required to adhere to Site Operating Procedures including social distancing guidelines to help prevent the spread of COVID-19.
    HS2-Denham-bridge-building-004.jpg
  • HS2 security guards monitor anti-HS2 activists standing in the river Colne at Denham Ford in order to try to delay bridge building works for the HS2 high-speed rail link on the first day of the second national coronavirus lockdown on 5 November 2020 in Denham, United Kingdom. Prime Minister Boris Johnson has advised that construction work may continue during the second lockdown but those working on construction projects are required to adhere to Site Operating Procedures including social distancing guidelines to help prevent the spread of COVID-19.
    HS2-Denham-bridge-building-020.jpg
  • HS2 security guards monitor an anti-HS2 activist swimming in the Grand Union Canal to halt tree felling works alongside HOAC lake in connection with the HS2 high-speed rail link on 21 September 2020 in Harefield, United Kingdom. Anti-HS2 activists continue to try to prevent or delay works for the controversial £106bn HS2 high-speed rail link on environmental and cost grounds from a series of protection camps based along the route of the line between London and Birmingham.
    HS2-tree-felling-canal-swim-025.jpg
  • HS2 security guards and enforcement agents monitor two anti-HS2 activists wading in the river Colne at Denham Ford in order to try to delay bridge building works for the HS2 high-speed rail link on the first day of the second national coronavirus lockdown on 5 November 2020 in Denham, United Kingdom. Prime Minister Boris Johnson has advised that construction work may continue during the second lockdown but those working on construction projects are required to adhere to Site Operating Procedures including social distancing guidelines to help prevent the spread of COVID-19.
    HS2-Denham-bridge-building-014.jpg
  • HS2 security guards monitor and film a press photographer on a public footpath during tree felling works alongside the Grand Union Canal in connection with the HS2 high-speed rail link on 21 September 2020 in Harefield, United Kingdom. Thousands of trees have already been felled in the Colne Valley for the controversial £106bn rail link.
    HS2-tree-felling-canal-swim-020.jpg
  • HS2 security guards form a line across the River Colne in front of Dan Hooper, widely known as Swampy during the 1990s, and a large cherry picker containing bailiffs on 8th December 2020 in Denham, United Kingdom. The climate and roads activist had occupied a bamboo tripod positioned in the river the previous day in order to delay the building of a bridge as part of works for the controversial HS2 high-speed rail link and a large security operation involving officers from at least three police forces, National Eviction Team enforcement agents and HS2 security guards was put in place to facilitate his removal.
    HS2-Swampy-arrest-Denham-012.jpg
  • HS2 security guards form a line across the river Colne in front of Dan Hooper, widely known as Swampy during the 1990s, and a large cherry picker containing enforcement agents on 8th December 2020 in Denham, United Kingdom. The climate and roads activist had occupied a bamboo tripod positioned in the river the previous day in order to delay the building of a bridge as part of works for the controversial HS2 high-speed rail link and a large security operation involving officers from at least three police forces, the National Eviction Team and HS2 security guards was put in place to facilitate his removal.
    HS2-Swampy-arrest-Denham-013.jpg
  • Denham, UK. 8th December, 2020. HS2 security guards form a line across the River Colne in front of Dan Hooper, widely known as Swampy during the 1990s. The climate and roads activist had occupied a bamboo tripod the previous day in order to delay the building of a bridge as part of works for the controversial HS2 high-speed rail link and a large security operation involving officers from at least three police forces, the National Eviction Team and HS2 security guards was put in place to facilitate his removal.
    HS2-Swampy-arrest-Denham-002.jpg
  • Denham, UK. 8th December, 2020. HS2 security guards form a line across the River Colne in front of Dan Hooper, widely known as Swampy during the 1990s. The climate and roads activist had occupied a bamboo tripod the previous day in order to delay the building of a bridge as part of works for the controversial HS2 high-speed rail link and a large security operation involving officers from at least three police forces, the National Eviction Team and HS2 security guards was put in place to facilitate his removal.
    HS2-Swampy-arrest-Denham-004.jpg
  • Denham, UK. 8th December, 2020. HS2 security guards form a line across the River Colne in front of Dan Hooper, widely known as Swampy during the 1990s. The climate and roads activist had occupied a bamboo tripod the previous day in order to delay the building of a bridge as part of works for the controversial HS2 high-speed rail link and a large security operation involving officers from at least three police forces, National Eviction Team enforcement agents and HS2 security guards was put in place to facilitate his removal.
    HS2-Swampy-arrest-Denham-005.jpg
  • HS2 security guards form a line across the River Colne in front of Dan Hooper, widely known as Swampy during the 1990s, and a large cherry picker containing a bailiff on 8th December 2020 in Denham, United Kingdom. The climate and roads activist had occupied a bamboo tripod positioned in the river the previous day in order to delay the building of a bridge as part of works for the controversial HS2 high-speed rail link and a large security operation involving officers from at least three police forces, National Eviction Team enforcement agents and HS2 security guards was put in place to facilitate his removal.
    HS2-Swampy-arrest-Denham-017.jpg
  • HS2 security guards form a line across the river Colne in front of Dan Hooper, widely known as Swampy during the 1990s, and a large cherry picker containing enforcement agents on 8th December 2020 in Denham, United Kingdom. The climate and roads activist had occupied a bamboo tripod positioned in the river the previous day in order to delay the building of a bridge as part of works for the controversial HS2 high-speed rail link and a large security operation involving officers from at least three police forces, the National Eviction Team and HS2 security guards was put in place to facilitate his removal.
    HS2-Swampy-arrest-Denham-008.jpg
  • Denham, UK. 5th November, 2020. HS2 security guards monitor two anti-HS2 activists standing in the river Colne at Denham Ford in order to try to delay bridge building works for the HS2 high-speed rail link on the first day of the second national coronavirus lockdown. Prime Minister Boris Johnson has advised that construction work may continue during the second lockdown but those working on construction projects are required to adhere to Site Operating Procedures including social distancing guidelines to help prevent the spread of COVID-19.
    HS2-Denham-bridge-building-016.jpg
  • Denham, UK. 5th November, 2020. HS2 security guards push female anti-HS2 activists in the river Colne at Denham Ford during bridge building works for the HS2 high-speed rail link on the first day of the second national coronavirus lockdown. Prime Minister Boris Johnson has advised that construction work may continue during the second lockdown but those working on construction projects are required to adhere to Site Operating Procedures including social distancing guidelines to help prevent the spread of COVID-19.
    HS2-Denham-bridge-building-024.jpg
  • Denham, UK. 5th November, 2020. HS2 security guards monitor bridge building works for the HS2 high-speed rail link at Denham Ford on the first day of the second national coronavirus lockdown. Prime Minister Boris Johnson has advised that construction work may continue during the second lockdown but those working on construction projects are required to adhere to Site Operating Procedures including social distancing guidelines to help prevent the spread of COVID-19.
    HS2-Denham-bridge-building-019.jpg
  • Police officers speak to an HS2 security guard holding an item which he had removed from the possessions of an anti-HS2 activist during tree felling works alongside the Grand Union Canal in connection with the HS2 high-speed rail link on 21 September 2020 in Harefield, United Kingdom. The police officers took possession of the item from the security guard, who had refused to return it to the activist, and returned it themselves to the activist on the opposite bank of the canal.
    HS2-tree-felling-canal-swim-016.jpg
  • Denham, UK. 5th November, 2020. HS2 security guards monitor anti-HS2 activists wading in the river Colne at Denham Ford in order to try to delay bridge building works for the HS2 high-speed rail link on the first day of the second national coronavirus lockdown. Prime Minister Boris Johnson has advised that construction work may continue during the second lockdown but those working on construction projects are required to adhere to Site Operating Procedures including social distancing guidelines to help prevent the spread of COVID-19.
    HS2-Denham-bridge-building-013.jpg
  • Police officers prepare to return an item taken without permission by an HS2 security guard from an anti-HS2 activist during tree felling works alongside the Grand Union Canal in connection with the HS2 high-speed rail link on 21 September 2020 in Harefield, United Kingdom.  Anti-HS2 activists continue to try to prevent or delay works for the controversial £106bn HS2 high-speed rail link on environmental and cost grounds from a series of protection camps based along the route of the line between London and Birmingham.
    HS2-tree-felling-canal-swim-027.jpg
  • An HS2 security guard (c) is filmed by an anti-HS2 activist after he pocketed an item belonging to a fellow activist during tree felling works alongside HOAC lake in connection with the HS2 high-speed rail link on 21 September 2020 in Harefield, United Kingdom. Anti-HS2 activists continue to try to prevent or delay works for the controversial £106bn HS2 high-speed rail link on environmental and cost grounds from a series of protection camps based along the route of the line between London and Birmingham.
    HS2-tree-felling-canal-swim-026.jpg
  • An HS2 security guard monitors an anti-HS2 activist swimming in the Grand Union Canal to halt tree felling works alongside HOAC lake in connection with the HS2 high-speed rail link on 21 September 2020 in Harefield, United Kingdom. Anti-HS2 activists continue to try to prevent or delay works for the controversial £106bn HS2 high-speed rail link on environmental and cost grounds from a series of protection camps based along the route of the line between London and Birmingham.
    HS2-tree-felling-canal-swim-021.jpg
  • An HS2 security guard is filmed by an anti-HS2 activist after he pocketed an item belonging to a fellow activist during tree felling works alongside HOAC lake in connection with the HS2 high-speed rail link on 21 September 2020 in Harefield, United Kingdom. Anti-HS2 activists continue to try to prevent or delay works for the controversial £106bn HS2 high-speed rail link on environmental and cost grounds from a series of protection camps based along the route of the line between London and Birmingham.
    HS2-tree-felling-canal-swim-019.jpg
  • An HS2 security guard monitors an anti-HS2 activist swimming in the Grand Union Canal to halt tree felling works alongside HOAC lake in connection with the HS2 high-speed rail link on 21 September 2020 in Harefield, United Kingdom. Anti-HS2 activists continue to try to prevent or delay works for the controversial £106bn HS2 high-speed rail link on environmental and cost grounds from a series of protection camps based along the route of the line between London and Birmingham.
    HS2-tree-felling-canal-swim-022.jpg
  • An HS2 security guard monitors an anti-HS2 activist standing in the Grand Union Canal to halt tree felling works alongside HOAC lake in connection with the HS2 high-speed rail link on 21 September 2020 in Harefield, United Kingdom. Anti-HS2 activists continue to try to prevent or delay works for the controversial £106bn HS2 high-speed rail link on environmental and cost grounds from a series of protection camps based along the route of the line between London and Birmingham.
    HS2-tree-felling-canal-swim-010.jpg
  • An HS2 security guard holds an item which a colleague had removed from the possessions of an anti-HS2 activist during tree felling works alongside HOAC lake in connection with the HS2 high-speed rail link on 21 September 2020 in Harefield, United Kingdom. Anti-HS2 activists continue to try to prevent or delay works for the controversial £106bn HS2 high-speed rail link on environmental and cost grounds from a series of protection camps based along the route of the line between London and Birmingham.
    HS2-tree-felling-canal-swim-017.jpg
  • An anti-HS2 activist (l) asks an HS2 security guard (c) to return an item which he pocketed belonging to a fellow activist during tree felling works alongside HOAC lake in connection with the HS2 high-speed rail link on 21 September 2020 in Harefield, United Kingdom. Anti-HS2 activists continue to try to prevent or delay works for the controversial £106bn HS2 high-speed rail link on environmental and cost grounds from a series of protection camps based along the route of the line between London and Birmingham.
    HS2-tree-felling-canal-swim-024.jpg
  • An HS2 security guard is taken away on a river boat after he removed an item belonging to an activist during tree felling works alongside HOAC lake in connection with the HS2 high-speed rail link on 21 September 2020 in Harefield, United Kingdom. Anti-HS2 activists continue to try to prevent or delay works for the controversial £106bn HS2 high-speed rail link on environmental and cost grounds from a series of protection camps based along the route of the line between London and Birmingham.
    HS2-tree-felling-canal-swim-012.jpg
  • A HS2 security guard films a press photographer on a public footpath during tree felling works alongside the Grand Union Canal in connection with the HS2 high-speed rail link on 21 September 2020 in Harefield, United Kingdom. Thousands of trees have already been felled in the Colne Valley for the controversial £106bn rail link.
    HS2-tree-felling-canal-swim-003.jpg
  • Denham, UK. 5th November, 2020. A HS2 security guard restrains a female anti-HS2 activist in the river Colne at Denham Ford during bridge building works for the HS2 high-speed rail link on the first day of the second national coronavirus lockdown. Prime Minister Boris Johnson has advised that construction work may continue during the second lockdown but those working on construction projects are required to adhere to Site Operating Procedures including social distancing guidelines to help prevent the spread of COVID-19.
    HS2-Denham-bridge-building-023.jpg
  • Metropolitan Police officers prepare to return an item removed without permission by an HS2 security guard from an anti-HS2 activist during tree felling works alongside the Grand Union Canal in connection with the HS2 high-speed rail link on 21 September 2020 in Harefield, United Kingdom.  Anti-HS2 activists continue to try to prevent or delay works for the controversial £106bn HS2 high-speed rail link on environmental and cost grounds from a series of protection camps based along the route of the line between London and Birmingham.
    HS2-tree-felling-canal-swim-006.jpg
  • Harefield, UK. 22 July, 2020. Masked HS2 security guards monitor environmental activists during tree felling works for the HS2 high-speed rail link close to Harvil Road. Environmental activists from HS2 Rebellion and Stop HS2 continue to protest against HS2, which is currently projected to cost £106bn and will remain a net contributor to CO2 emissions during its projected 120-year lifespan, from a series of wildlife protection camps along its route.
    HS2-Harvil-Colne-tree-felling-008.jpg
  • Harefield, UK. 22 July, 2020. Masked HS2 security guards monitor tree felling works for the HS2 high-speed rail link close to Harvil Road. Environmental activists from HS2 Rebellion and Stop HS2 continue to protest against HS2, which is currently projected to cost £106bn and will remain a net contributor to CO2 emissions during its projected 120-year lifespan, from a series of wildlife protection camps along its route.
    HS2-Harvil-Colne-tree-felling-006.jpg
  • Harefield, UK. 22 July, 2020. Masked HS2 security guards walk along Harvil Road to a site for the HS2 high-speed rail link which had been occupied by activists from HS2 Rebellion in order to hinder tree felling works. Environmental activists continue to protest against HS2, which is currently projected to cost £106bn and will remain a net contributor to CO2 emissions during its projected 120-year lifespan, from a series of wildlife protection camps along its route.
    HS2-Harvil-Colne-tree-felling-003.jpg
  • A distressed anti-HS2 activist is removed from the river Colne by security guards and a fellow activist on 8th December 2020 in Denham, United Kingdom. The activists had been supporting Dan Hooper, widely known as Swampy during the 1990s, who had occupied a bamboo tripod positioned in the river the previous day in order to delay the building of a bridge as part of works for the controversial HS2 high-speed rail link and a large security operation involving officers from at least three police forces, the National Eviction Team and HS2 security guards was put in place to facilitate his removal.
    HS2-Swampy-arrest-Denham-042.jpg
  • Harefield, UK. 22 July, 2020. Masked HS2 security guards arrive at a site for the HS2 high-speed rail link which had been occupied by activists from HS2 Rebellion in order to hinder tree felling works. Environmental activists continue to protest against HS2, which is currently projected to cost £106bn and will remain a net contributor to CO2 emissions during its projected 120-year lifespan, from a series of wildlife protection camps along its route.
    HS2-Harvil-Colne-tree-felling-015.jpg
  • Denham, UK. 8th December, 2020. HS2 security guards form a line across the River Colne in front of Dan Hooper, widely known as Swampy during the 1990s, and a large cherry picker. The climate and roads activist had occupied a bamboo tripod positioned in the river the previous day in order to delay the building of a bridge as part of works for the controversial HS2 high-speed rail link and a large security operation involving officers from at least three police forces, National Eviction Team enforcement agents and HS2 security guards was put in place to facilitate his removal.
    HS2-Swampy-arrest-Denham-019.jpg
  • HS2 workers pause tree felling works alongside the Grand Union Canal in connection with the HS2 high-speed rail link due to the arrival of anti-HS2 activists on the other bank of the canal on 21 September 2020 in Harefield, United Kingdom. Anti-HS2 activists continue to try to prevent or delay works for the controversial £106bn HS2 high-speed rail link on environmental and cost grounds from a series of protection camps based along the route of the line between London and Birmingham.
    HS2-tree-felling-canal-swim-011.jpg
  • HS2 workers carry out tree felling works alongside the Grand Union Canal in connection with the HS2 high-speed rail link on 21 September 2020 in Harefield, United Kingdom. Thousands of trees have already been felled in the Colne Valley for the controversial £106bn rail link.
    HS2-tree-felling-canal-swim-014.jpg
  • HS2 workers carry out tree felling works alongside the Grand Union Canal in connection with the HS2 high-speed rail link on 21 September 2020 in Harefield, United Kingdom. Thousands of trees have already been felled in the Colne Valley for the controversial £106bn rail link.
    HS2-tree-felling-canal-swim-023.jpg
  • Activists dressed as HS2 security guards and workers take part in a HS2 Chainsaw Massacre protest outside the Among The Trees exhibition at the Hayward Gallery on 30 October 2020 in London, United Kingdom. The protest was intended to highlight both the daily environmental destruction being wrought for the controversial HS2 high-speed rail project and instances of violence and brutality by security guards and bailiffs working on behalf of HS2 Ltd.
    HS2-Hayward-Gallery-Trees-009.jpg
  • Bailiffs suspended from a large cherry picker work to remove Dan Hooper, widely known as Swampy during the 1990s, who is sitting on a bamboo tripod positioned in the river Colne on 8th December 2020 in Denham, United Kingdom. The climate and roads activist had occupied the tripod the previous day in order to delay the building of a bridge as part of works for the controversial HS2 high-speed rail link and a large security operation involving officers from at least three police forces, National Eviction Team enforcement agents and HS2 security guards was put in place to facilitate his removal.
    HS2-Swampy-arrest-Denham-046.jpg
  • Denham, UK. 8th December, 2020. Bailiffs suspended from a large cherry picker work to remove Dan Hooper, widely known as Swampy during the 1990s, who is sitting on a bamboo tripod positioned in the river Colne. The climate and roads activist had occupied the tripod the previous day in order to delay the building of a bridge as part of works for the controversial HS2 high-speed rail link and a large security operation involving officers from at least three police forces, the National Eviction Team and HS2 security guards was put in place to facilitate his removal.
    HS2-Swampy-arrest-Denham-051.jpg
  • Denham, UK. 8th December, 2020. Bailiffs hand over Dan Hooper, widely known as Swampy during the 1990s, to Hampshire Police officers after extracting him from a bamboo tripod positioned in the river Colne. The climate and roads activist had occupied the tripod the previous day in order to delay the building of a bridge as part of works for the controversial HS2 high-speed rail link and a large security operation involving officers from at least three police forces, the National Eviction Team and HS2 security guards was put in place to facilitate his removal.
    HS2-Swampy-arrest-Denham-052.jpg
  • Denham, UK. 8th December, 2020. HS2 security guards form a line across the River Colne during a large security operation to remove Dan Hooper, widely known as Swampy during the 1990s, from a bamboo tripod. The climate and roads activist had occupied the tripod the previous day in order to delay the building of a bridge as part of works for the controversial HS2 high-speed rail link.
    HS2-Swampy-arrest-Denham-003.jpg
  • Denham, UK. 8th December, 2020. Bailiffs suspended from a large cherry picker work to remove Dan Hooper, widely known as Swampy during the 1990s, who is sitting on a bamboo tripod positioned in the river Colne. The climate and roads activist had occupied the tripod the previous day in order to delay the building of a bridge as part of works for the controversial HS2 high-speed rail link and a large security operation involving officers from at least three police forces, the National Eviction Team and HS2 security guards was put in place to facilitate his removal.
    HS2-Swampy-arrest-Denham-047.jpg
  • Security guards working on behalf of HS2 forcibly remove environmental activists from HS2 Rebellion from the road in front of a gate providing access to a site for the HS2 high-speed rail link on 12 September 2020 in Harefield, United Kingdom. Anti-HS2 activists continue to try to prevent or delay works on the controversial £106bn HS2 high-speed rail link in the Colne Valley where thousands of trees have already been felled.
    HS2-Harvil-Road-blocked-gate-017.jpg
  • Security guards working on behalf of HS2 forcibly remove environmental activists from HS2 Rebellion from the road in front of a gate providing access to a site for the HS2 high-speed rail link on 12 September 2020 in Harefield, United Kingdom. Anti-HS2 activists continue to try to prevent or delay works on the controversial £106bn HS2 high-speed rail link in the Colne Valley where thousands of trees have already been felled.
    HS2-Harvil-Road-blocked-gate-004.jpg
  • Harefield, UK. 12th September, 2020. Security guards working on behalf of HS2 forcibly remove environmental activists acting in solidarity with HS2 Rebellion from the road in front of a gate providing access to a site for the HS2 high-speed rail link. Anti-HS2 activists continue to try to prevent or delay works on the controversial £106bn HS2 high-speed rail link in the Colne Valley where thousands of trees have already been felled.
    MK-20200912-HS2-Harvil-Road-roadbloc...jpg
  • Harefield, UK. 12th September, 2020. Security guards working on behalf of HS2 forcibly restrain environmental activists acting in solidarity with HS2 Rebellion next to a gate providing access to a site for the HS2 high-speed rail link. Anti-HS2 activists continue to try to prevent or delay works on the controversial £106bn HS2 high-speed rail link in the Colne Valley where thousands of trees have already been felled.
    HS2-Harvil-Road-blocked-gate-031.jpg
  • Harefield, UK. 12th September, 2020. Security guards working on behalf of HS2 block environmental activists acting in solidarity with HS2 Rebellion from the road in front of a gate providing access to a site for the HS2 high-speed rail link. Anti-HS2 activists continue to try to prevent or delay works on the controversial £106bn HS2 high-speed rail link in the Colne Valley where thousands of trees have already been felled.
    HS2-Harvil-Road-blocked-gate-026.jpg
  • Security guards working on behalf of HS2 remove environmental activists from HS2 Rebellion from the road in front of a gate providing access to a site for the HS2 high-speed rail link on 12 September 2020 in Harefield, United Kingdom. Anti-HS2 activists continue to try to prevent or delay works on the controversial £106bn HS2 high-speed rail link in the Colne Valley where thousands of trees have already been felled.
    HS2-Harvil-Road-blocked-gate-025.jpg
  • Security guards working on behalf of HS2 forcibly remove environmental activists from HS2 Rebellion from the road in front of a gate providing access to a site for the HS2 high-speed rail link on 12 September 2020 in Harefield, United Kingdom. Anti-HS2 activists continue to try to prevent or delay works on the controversial £106bn HS2 high-speed rail link in the Colne Valley where thousands of trees have already been felled.
    HS2-Harvil-Road-blocked-gate-012.jpg
  • Harefield, UK. 12th September, 2020. Security guards working on behalf of HS2 forcibly remove environmental activists acting in solidarity with HS2 Rebellion from the road in front of a gate providing access to a site for the HS2 high-speed rail link. Anti-HS2 activists continue to try to prevent or delay works on the controversial £106bn HS2 high-speed rail link in the Colne Valley where thousands of trees have already been felled.
    MK-20200912-HS2-Harvil-Road-roadbloc...jpg
  • Harefield, UK. 12th September, 2020. Security guards working on behalf of HS2 forcibly remove environmental activists acting in solidarity with HS2 Rebellion from the road in front of a gate providing access to a site for the HS2 high-speed rail link. Anti-HS2 activists continue to try to prevent or delay works on the controversial £106bn HS2 high-speed rail link in the Colne Valley where thousands of trees have already been felled.
    MK-20200912-HS2-Harvil-Road-roadbloc...jpg
  • Harefield, UK. 12th September, 2020. Security guards working on behalf of HS2 forcibly restrain environmental activists acting in solidarity with HS2 Rebellion from the road in front of a gate providing access to a site for the HS2 high-speed rail link. Anti-HS2 activists continue to try to prevent or delay works on the controversial £106bn HS2 high-speed rail link in the Colne Valley where thousands of trees have already been felled.
    HS2-Harvil-Road-blocked-gate-030.jpg
  • Security guards working on behalf of HS2 forcibly remove environmental activists from HS2 Rebellion from the road in front of a gate providing access to a site for the HS2 high-speed rail link on 12 September 2020 in Harefield, United Kingdom. Anti-HS2 activists continue to try to prevent or delay works on the controversial £106bn HS2 high-speed rail link in the Colne Valley where thousands of trees have already been felled.
    HS2-Harvil-Road-blocked-gate-020.jpg
  • Harefield, UK. 12th September, 2020. Security guards working on behalf of HS2 forcibly restrain environmental activists acting in solidarity with HS2 Rebellion from the road in front of a gate providing access to a site for the HS2 high-speed rail link. Anti-HS2 activists continue to try to prevent or delay works on the controversial £106bn HS2 high-speed rail link in the Colne Valley where thousands of trees have already been felled.
    HS2-Harvil-Road-blocked-gate-024.jpg
  • Harefield, UK. 12th September, 2020. Security guards working on behalf of HS2 remove environmental activists acting in solidarity with HS2 Rebellion from the road in front of a gate providing access to a site for the HS2 high-speed rail link. Anti-HS2 activists continue to try to prevent or delay works on the controversial £106bn HS2 high-speed rail link in the Colne Valley where thousands of trees have already been felled.
    HS2-Harvil-Road-blocked-gate-033.jpg
  • An activist holds up his injured hand after he was forcibly removed by security guards acting for HS2 whilst superglued to the road in front of a gate providing access to a site for the HS2 high-speed rail link on 12 September 2020 in Harefield, United Kingdom. Anti-HS2 activists continue to try to prevent or delay works on the controversial £106bn HS2 high-speed rail link in the Colne Valley where thousands of trees have already been felled.
    HS2-Harvil-Road-blocked-gate-007.jpg
  • Harefield, UK. 18 February, 2020. Environmental activists from Save the Colne Valley, Stop HS2 and Extinction Rebellion monitor HS2 workers, accompanied by security guards, as they survey a large tree on a site in the Colne Valley earmarked for the HS2 high-speed rail link.
    HS2-tree-survey-Colne-Valley-003.jpg
  • Security guards working on behalf of HS2 forcibly remove environmental activists from HS2 Rebellion from the road in front of a gate providing access to a site for the HS2 high-speed rail link on 12 September 2020 in Harefield, United Kingdom. Anti-HS2 activists continue to try to prevent or delay works on the controversial £106bn HS2 high-speed rail link in the Colne Valley where thousands of trees have already been felled.
    HS2-Harvil-Road-blocked-gate-009.jpg
  • Security guards working on behalf of HS2 forcibly remove environmental activists from HS2 Rebellion from the road in front of a gate providing access to a site for the HS2 high-speed rail link on 12 September 2020 in Harefield, United Kingdom. Anti-HS2 activists continue to try to prevent or delay works on the controversial £106bn HS2 high-speed rail link in the Colne Valley where thousands of trees have already been felled.
    HS2-Harvil-Road-blocked-gate-003.jpg
  • Security guards working on behalf of HS2 forcibly remove environmental activists from HS2 Rebellion from the road in front of a gate providing access to a site for the HS2 high-speed rail link on 12 September 2020 in Harefield, United Kingdom. Anti-HS2 activists continue to try to prevent or delay works on the controversial £106bn HS2 high-speed rail link in the Colne Valley where thousands of trees have already been felled.
    HS2-Harvil-Road-blocked-gate-022.jpg
  • Security guards working on behalf of HS2 remove environmental activists from HS2 Rebellion from the road in front of a gate providing access to a site for the HS2 high-speed rail link on 12 September 2020 in Harefield, United Kingdom. Anti-HS2 activists continue to try to prevent or delay works on the controversial £106bn HS2 high-speed rail link in the Colne Valley where thousands of trees have already been felled.
    HS2-Harvil-Road-blocked-gate-010.jpg
  • A security guard working on behalf of HS2 forcibly removes an environmental activist from HS2 Rebellion from the road in front of a gate providing access to a site for the HS2 high-speed rail link on 12 September 2020 in Harefield, United Kingdom. Anti-HS2 activists continue to try to prevent or delay works on the controversial £106bn HS2 high-speed rail link in the Colne Valley where thousands of trees have already been felled.
    HS2-Harvil-Road-blocked-gate-006.jpg
  • Denham, UK. 7th December, 2020. HS2 security guards are seen through a barricade at Denham Ford Protection Camp. Anti-HS2 activists continue to resist the controversial £106bn high-speed rail project from a series of protest camps based along its initial route between London and Birmingham.
    HS2-Denham-bridge-Swampy-010.jpg
  • Harefield, UK. 22 July, 2020. A masked HS2 security guard observes a press photographer during works for the HS2 high-speed rail link close to Harvil Road. Environmental activists from HS2 Rebellion and Stop HS2 continue to protest against HS2, which is currently projected to cost £106bn and will remain a net contributor to CO2 emissions during its projected 120-year lifespan, from a series of wildlife protection camps along its route.
    HS2-Harvil-Colne-tree-felling-019.jpg
  • Denham, UK. 7th December, 2020. HS2 security guards are seen through a barricade at Denham Ford Protection Camp. Anti-HS2 activists continue to resist the controversial £106bn high-speed rail project from a series of protest camps based along its initial route between London and Birmingham.
    HS2-Denham-bridge-Swampy-020.jpg
  • Harefield, UK. 22 July, 2020. A masked HS2 security guard observes a press photographer during works for the HS2 high-speed rail link close to Harvil Road. Environmental activists from HS2 Rebellion and Stop HS2 continue to protest against HS2, which is currently projected to cost £106bn and will remain a net contributor to CO2 emissions during its projected 120-year lifespan, from a series of wildlife protection camps along its route.
    HS2-Harvil-Colne-tree-felling-013.jpg
  • HS2 security guards watch an HS2 Rebellion activist climb a tree in Denham Country Park in order to try to protect it from works for the HS2 high-speed rail link on 8 September 2020 in Denham, United Kingdom. Anti-HS2 activists continue to try to prevent or delay works on the controversial £106bn project for which the construction phase was announced on 4th September from a series of protection camps based along the route of the line between London and Birmingham.
    HS2-Denham-tree-camp-011.jpg
  • Harefield, UK. 22 July, 2020. Activists from HS2 Rebellion who had occupied machinery and trees in order to hinder tree felling for the HS2 high-speed rail link are escorted to a works site gate by HS2 workers and security guards. Environmental activists continue to protest against HS2, which is currently projected to cost £106bn and will remain a net contributor to CO2 emissions during its projected 120-year lifespan, from a series of wildlife protection camps along its route.
    HS2-Harvil-Colne-tree-felling-005.jpg
  • Harefield, UK. 22 July, 2020. Activists from HS2 Rebellion who had occupied machinery and trees in order to hinder tree felling for the HS2 high-speed rail link are escorted to a works site gate by HS2 workers and security guards. Environmental activists continue to protest against HS2, which is currently projected to cost £106bn and will remain a net contributor to CO2 emissions during its projected 120-year lifespan, from a series of wildlife protection camps along its route.
    HS2-Harvil-Colne-tree-felling-002.jpg
  • Denham, UK. 8th September, 2020. HS2 security guards and National Eviction Team enforcement agents monitor a HS2 Rebellion activist climbing a tree in Denham Country Park in order to try to protect it from works for the HS2 high-speed rail link. Anti-HS2 activists continue to try to prevent or delay works on the controversial £106bn project for which the construction phase was announced on 4th September from a series of protection camps based along the route of the line between London and Birmingham.
    HS2-Denham-tree-camp-009.jpg
  • Denham, UK. 8th September, 2020. HS2 security guards and National Eviction Team enforcement agents monitor a HS2 Rebellion activist climbing a tree in Denham Country Park in order to try to protect it from works for the HS2 high-speed rail link. Anti-HS2 activists continue to try to prevent or delay works on the controversial £106bn project for which the construction phase was announced on 4th September from a series of protection camps based along the route of the line between London and Birmingham.
    HS2-Denham-tree-camp-002.jpg
  • Denham, UK. 8th September, 2020. HS2 security guards try to prevent HS2 Rebellion activists from supporting a fellow activist who had climbed a tree in Denham Country Park in order to try to protect it from works for the HS2 high-speed rail link. Anti-HS2 activists continue to try to prevent or delay works on the controversial £106bn project for which the construction phase was announced on 4th September from a series of protection camps based along the route of the line between London and Birmingham.
    HS2-Denham-tree-camp-003.jpg
  • Harefield, UK. 22 July, 2020. Activists from HS2 Rebellion who had occupied machinery and trees in order to hinder tree felling for the HS2 high-speed rail link are escorted to a works site gate by HS2 workers and security guards. Environmental activists continue to protest against HS2, which is currently projected to cost £106bn and will remain a net contributor to CO2 emissions during its projected 120-year lifespan, from a series of wildlife protection camps along its route.
    HS2-Harvil-Colne-tree-felling-018.jpg
  • Denham, UK. 8th September, 2020. National Eviction Team enforcement agents and HS2 security guards stand in the river Colne to prevent HS2 Rebellion activists from supporting a fellow activist who had climbed a tree in Denham Country Park in order to try to protect it from works for the HS2 high-speed rail link. Anti-HS2 activists continue to try to prevent or delay works on the controversial £106bn project for which the construction phase was announced on 4th September from a series of protection camps based along the route of the line between London and Birmingham.
    HS2-Denham-tree-camp-012.jpg
  • Harefield, UK. 22 July, 2020. Activists from HS2 Rebellion who had occupied machinery and trees in order to hinder tree felling for the HS2 high-speed rail link are escorted to a works site gate by HS2 workers and security guards. Environmental activists continue to protest against HS2, which is currently projected to cost £106bn and will remain a net contributor to CO2 emissions during its projected 120-year lifespan, from a series of wildlife protection camps along its route.
    HS2-Harvil-Colne-tree-felling-010.jpg
Next