HS2 works Chilterns
Add to Cart Add to Lightbox DownloadChalfont St Giles, UK. 18th July, 2020. A new water pipeline and temporary haul road are constructed for the HS2 high-speed rail link close to the Chiltern Heritage Trail and South Bucks Way. The pipeline is being constructed to protect against the creation of turbidity in the water supply as a result of tunnelling and piledriving whilst the haul road will be used to construct a ventilation shaft for the Chiltern Tunnel.
- Filename
- HS2-works-Chalfont-St-Giles-022.jpg
- Copyright
- Copyright 2020 Mark Kerrison
- Image Size
- 5123x3415 / 2.8MB
- https://www.markkerrison.com/p/licensing
- https://www.markkerrison.com/contact
-
affinity water barhale bottom house farm lane britain british chalfont st giles chiltern heritage trail chiltern tunnel chilterns countryside england english environment environmental ground clearance haul road high speed 2 high speed rail high speed rail link high speed two high-speed 2 high-speed rail high-speed rail link high-speed two hiking hs2 machinery piledriving pipeline rail railway rambling sign signpost south bucks way track trackway transport tunnelling turbidity uk united kingdom vegetation clearance ventilation shaft walking walking route walking sign
- Contained in galleries
- 2020-07-17-18 HS2 works: Chilterns

