• Facebook
  • Twitter
x

MARK KERRISON | Photojournalist

  • Live News Feed
  • Slideshows
  • About
    • About
    • Data Protection
    • Terms and Conditions
  • Contact
Show Navigation
search results
Cart Lightbox Client Area
Prev 3 of 3

Stop HS2 campaigners lobby Parliament, London, UK

Add to Cart Add to Lightbox Download

London, UK. 22 January, 2020. Elizabeth Cairns, author of ‘The Empowered Entrepreneur’ and Extinction Rebellion member, arrives at Parliament with her daughter, other campaigners seeking to protect ancient woodland and wildlife threatened by the HS2 high-speed rail link and letters from other campaigners opposed to HS2 to lobby MPs to speak out against and push for an immediate halt to works for the huge infrastructure project. Cost projections for the project, which would destroy or irreparably damage 108 ancient woodlands, are reported to have risen to £106bn and the Government is expected to make a decision about its viability in February.

Filename
Stop-HS2-lobby-Parliament-002.jpg
Copyright
Copyright 2020 Mark Kerrison
Image Size
6409x4273 / 17.8MB
https://www.markkerrison.com/p/licensing
https://www.markkerrison.com/contact
2020 activist campaigner colne valley elizabeth cairns environment extinction rebellion great britain high speed 2 high speed two high-speed rail high-speed rail link hs2 infrastructure january letter lobby london parliament rail railway save the colne valley stop hs2 transport uk united kingdom westminster
Contained in galleries
2020-01-22 Stop HS2 campaigners lobby Parliament
twitterlinkedinfacebook
London, UK. 22 January, 2020. Elizabeth Cairns, author of ‘The Empowered Entrepreneur’ and Extinction Rebellion member, arrives at Parliament with her daughter, other campaigners seeking to protect ancient woodland and wildlife threatened by the HS2 high-speed rail link and letters from other campaigners opposed to HS2 to lobby MPs to speak out against and push for an immediate halt to works for the huge infrastructure project. Cost projections for the project, which would destroy or irreparably damage 108 ancient woodlands, are reported to have risen to £106bn and the Government is expected to make a decision about its viability in February.