• Facebook
  • Twitter
x

MARK KERRISON | Photojournalist

  • Live News Feed
  • Slideshows
  • About
    • About
    • Data Protection
    • Terms and Conditions
  • Contact
Show Navigation
2020-11-05 HS2 bridge building in Denham: Lockdown 2 Day 1
Cart Lightbox Client Area
Prev 25 of 25

Denham Against HS2 Sign Denham

Add to Cart Add to Lightbox Download

Denham, UK. 5th November, 2020. A sign produced by the Denham Against HS2 and Stop HS2 campaigns. Prime Minister Boris Johnson has advised that construction work may continue during the second national coronavirus lockdown but those working on construction projects are required to adhere to Site Operating Procedures including social distancing guidelines to help prevent the spread of COVID-19.

Filename
HS2-Denham-bridge-building-026.jpg
Copyright
Copyright 2020 Mark Kerrison
Image Size
5122x3415 / 5.7MB
https://www.markkerrison.com/p/licensing
https://www.markkerrison.com/contact
activism britain british buckinghamshire colne valley construction coronavirus covid covid-19 denham denham against hs2 england english environment environmental great britain high speed high speed 2 high speed two high-speed high-speed 2 high-speed rail link high-speed two hoarding hs2 line link pandemic protest rail railway shut down hs2 sign stop hs2 stop the virus train transport uk united kingdom virus
twitterlinkedinfacebook
Denham, UK. 5th November, 2020. A sign produced by the Denham Against HS2 and Stop HS2 campaigns. Prime Minister Boris Johnson has advised that construction work may continue during the second national coronavirus lockdown but those working on construction projects are required to adhere to Site Operating Procedures including social distancing guidelines to help prevent the spread of COVID-19.